Power Shut down in Jammu

Power Shut down in Jammu

JAMMU, JULY 23 –In order to carry out erection of two   33 KV VCBs in the Line Bay (One No. in MES Line Bay) by M/s. IRCON International Limited, the power supply to Channi Himmat, Channi Rama, Malik Market, Gurudwara, Chowadi, Sainik Colony, MES, Sunjwah and its adjoining areas shall remain affected on   July 25 from 6 am to 10 am.

Meanwhile, in order to carry out erection of  33 KV VCB in the Line Bay by M/s. IRCON International Limited, the power supply to Birpur Industrial Complex , Ratnu Chak, Kalu Chak, Greater Kailash, Seora, Kanhal, part of Bari Brahmana and its adjoining areas shall remain affected on 26th July 2015 from 6 am to 9 am.

Similarly, to complete the balance work of jumpering of 132 KV line bay for RTSS Samba under DC work Railway at 132/66 Grid Station Samba, the power supply to Samba town, industrial area, Bari Brahmana, Ghagwal, Vijaypur and their adjoining areas shall remain affected on   July 26 from 8 am to 12 noon. However, the power supply to Grid Station, Bari Brahmana-II shall be met from Gladni Grid Station during the shutdown period.

Leave a Comment