Power shut down on Aug 23

Power shut down on Aug 23

JAMMU, AUGUST 22- In order to carry out the work of Tan Delta Testing of 50 MVA Transformer at 132/33 KV Grid Station Gangyal, the shutdown of 132/33 KV Grid Station Gangyal on 23-08-2015 from 8 a.m. to 9 a.m. is allowed.

As intimated by Chief Engineer, S&O Wing Jammu, during the shutdown period the power supply to Gangyal Industrial Complex, Trikuta Nagar, Greater Kailash, Seora, Babllana and adjoining areas shall be affected.

Leave a Comment