Power shutdown

Power shutdown

JAMMU, MAY 21 – In order to carry out the shifting of 150 Amp load from 33 KV BB-II to 33 KV New Kartholi line to avoid overloading, the shutdown of 33 KV BB-II, 33 KV Ratnu chak, 33 KV Kartholi line from 132/33 KV Grid Station BB-II and 33 KV Narbada line from 132/33 KV Grid Station BB-I is being observed   on22.5.2016 from 08:00 AM to 11:00 AM
             During the shutdown, the power supply to Industrial   B-21, BB-22, BB-23, BB-24, BB-25, Ansal Flats Birpur, Datta Talab, EPIP Katholi Industrial area and Bari Brahmana Industrial area shall remain affected.

Leave a Comment