Power shutdown scheduled for Jammu

489

As per Superintending Engineer Electt, Maintt & RE Circle-Kathua to carry out the work for stringing of 120 sq MM LT AB cable at various locations, the shutdown of 11 KV-II feeder is being observed.

During the shutdown, the power supply to Kalibari, Shiva Nagar and Flour Mill shall remain affected from September 06 to 08 from 9 am to 12 noon.