Tawi Bridge Restarted Temporarily

17

Pictures by Sandeep

Tawi reached the level of 33 feet during the devastating flood and flushed one of the new bridges. As the city is picking up pace the bridge has been restarted so as to bring more ease to the people. The provision to commute via this bridge has been aided to the locals but it is rather making the bridge more prone to mishaps. The construction material  used is temporary and would not be able to hold itself if it the city experiences continuous rains. Restarting it again in such a temporary manner has put lives on stake because if the level rises up it will be flushed again in no time.