Black topping of roads begin in Bhagwati Nagar

18

The Road network across Jammu and Kashmir suffered extensive damage when the floods wrecked the state. The new Bhagwati Nagar bridge was ruined to shambles by the fury of flood waters of the Tawi river. The bridge was damaged to a length of about 60 meters and filling behind A3 and A4 on Bhagwati Nagar Side had also suffered minor damage. Meanwhile, people had to make do with the kacchha road built by PWD. But from today, the process of black-topping the roads has begun so as to normalize the vehicular traffic.

IMG-20150209-WA0000


IMG-20150209-WA0002

Get real time updates directly on you device, subscribe now.